Hi All,
Im getting this strange error while trying to save Time Dimension after making changes to it.
Initially, the Time dimension was built and processed based on a table. I ran few SQL Updates(changed only data not the table design or datatypes) in management studio to modify column values, then trying to make more changes in BIDS and saving the dimension.
But im not able to save,string not recognized as valid datetime Error messege is poping up everytime i try and save the dimension.
Im guessing this might be something to do with Visual studio?
Note:
-Other dimensions in project are working fine, im able to save changes to them.
-Tried removing Time dimension from project and included a older version and tried to make changes/save-dint work..
-Tried to open project in VS 2008 and made changes/save-dint work...
Thanks
Rakesh
↧