Hi,
Simple question on SSAS 2012 cube :
How can I schedule to process the OLAP Cube (processign DIM and FACT) on a daily basis (i.e. default process--> delta changes only) ?
Thanks
Hi,
Simple question on SSAS 2012 cube :
How can I schedule to process the OLAP Cube (processign DIM and FACT) on a daily basis (i.e. default process--> delta changes only) ?
Thanks